Hello all,
I have been plagued with the challenge of the getting workflows to work in Project server 2013 and would need help from anyone as soon as possible. I have configured Workflow Manager successfully and tried using SharePoint Designer to build my workflow but I got stuck when I tested the workflow and the "Submit" button was greyed out. Researched loads of blogs about that all to no avail. I then decided to use VS 2012 to build my workflow so I began with creating a sample workflow as explained inthis blog and in the 2013 demand management guide. I have followed all of these steps as explained but when I try to deploy the solution I get an error message as displayed.
Does this mean I have to insert parameters in the value="" section in the xml file? If yes please what values will be inserted here and where are these values?
This issue has given me a lot of sleepless nights. I'd appreciate a positive reply soon.
Thanks.