I Have a project server 2013 environment (Sandbox right now but on its way to a production system.) and we have AD sync set up for our enterprise resource pool.
We have 2 situations:
1. AD only brings certain information over (Name, email etc) and leaves other information out: Which calendar to use, base cost rate, Resource departments, Time sheet approver (their manager)
2. IN AD we store the employee number and would like to map it to the External ID field. (And several other things need to happen - outlook out of office sync, resource can be leveled etc)
I have not seen a way "add" this information programmatically. Everything I see says open the resource in Project pro and update. when you have 10,000 resources manual updates and changes are not really practical. Ideally we would be able to have some logic that looks at a table and as resources are added/updated the various fields are filled in as part of the "ad Sync job"
Question: Is this possible an has anyone done it? If so how?
Thanks
Tasks