I found some assignments with different TaskUID in the table "pub.MSP_TIMESHEET_LINES" and MSP_EpmAssignment of the same assignmentuid.
Is it by design? And by the way, I also see some task uid in MSP_TimesheetTask but not in MSP_EpmTask table, should this be normal?
Kevin Li