Hi All
I would like to build a custom field called 'RAG' that displays indicators based on the information automatically created in the Project [Status] field.
I have read multiple posts on similar topics and tried different formulas and approaches but I get errors or don't get the expected result.
I am new to using MS Project so please excuse me if I don't articulate this very well but what I am looking for would be the content of my custom 'RAG' column to equal the content of the [Status] column i.e. 'Complete' 'On Schedule' etc (or the numbering that I believe actually sits behind the text that is displayed). This way I would then be able to set indicators for the results.
Thanks
Andrea