Sending e-mail notifications about Project Workflow Progress?

Hello,I have customized the sample proposal workflow, and it pretty much fits our needs. Now I would like to implement e-mail notifications, so after every progress into next stage, the email...

View Article


PWA 2010 timesheet: 2 different colors for the rows “Actual “ and “Planned

Hello,To make timesheet easier to read and fill, is it possible to have 2 different colors for the rows “Actual “ and “Planned”?Thanks,soudha

View Article


Project Server 2010 Force Organizational Rules (constraints) on Project Schedule

Can I apply organizational rules (constraints) on all the Projects Schedule. For example: we have a business rule that, each Milestone can only 1 dependency task (more precisely summary task), while...

View Article

InfoPath Custom Forms for Project Server 2013

Hi, I need to create custom forms related to projects in Project Server 2013. I thought InfoPath would be the solution. But I couldn't find any resources documenting how could this be done. Am I...

View Article

Table name for storing delegated and delegatee data

Hi ,I need to develop a component and for that I need to fetch the data of delegated control for providing some security mechanism,Can any one tell me what are the tables that are stores the data of...

View Article


See PDP within the project site

How displaying a PDP within the project site? When trying to add one webpart for customize fields, is returned message that the webpart can not be used in the context of the project site.  To redirect...

View Article

Issues and Risks Page: How is this page's data displayed? PSI or Reporting...

The Issues and Risks page (issuesandrisks.aspx) serves up a list of issues/risks that are assigned to me.  Is this a PSI call behind the scenes, or a call to the Reporting DB?  Has anyone gone to this...

View Article

[Q] Change the project's .net framework from 4.5 to 4.0

-I'm a new member, hope that I'm asking in the correct forum! :), and I'm a new user for MS Visual Studio-How can I change the project's .net framework from 4.5 to 4.0I've created a project with .NET...

View Article


View Workspace Document Library on a PDP -- Project Server 2013

Regards!!In Project Server 2010 exists a Solution Starter called "Project Workspace List Viewer". I need the same solution but in Project Server 2013, is this possible?? does somebody has created the...

View Article


Calendar

I cannot make edits to a calendar within projects, everything is in grey, but I can make changes to the calendar from the Project server, I do not want to do this, need to change from within projects....

View Article

VBA Modification Needed

Hi FolksI need help in modifying the following code to open an existing workbook and populate with data from a mpp file:Sub ExportMasterScheduleData()'Start Excel and create a new workbook'Create...

View Article

Blind Navigation System Development using Kinect and C++

Hi,I'm doing a thesis on Blind Navigation System Development using Kinect. Ideally, it should work like this: 3d depth sensors and RGB camera will get it's input from the environment, then the Kinect...

View Article

IE8 compatibility issue for window opening (When using Domain name)

hi All, In my application we are opening a window and loading a image, first time its opening new window and properly showing image,  subsequent window opens will overrite the exisitng image in already...

View Article


VBA Web Services in MS Project Server 2010

WhereI work,the administration ofMSProject 2010serveris outsourced.And I need tosee information such as:1.Project;2.Assigments;3.Tasks;4.Resources;5.etc..Is there anyway to accessvia VBA(Excel)Web...

View Article

Stopping Video at last frame in Power Point

I produced a video clip in WMV via  PowerDirector 12 overlayed with a running time clock. I put that clip into Microsoft power point 2010. I wanted the video to stop on the last frame to show how much...

View Article


ProjectServer 2013 - Linked Workflows

Hello,Im working on an Project Management workflow, and I need to add a validation so that a document must be approved before I can change the current stage. So, I have a document approval workflow and...

View Article

User (Resource) custom field Update Using CSOM

How do i update the User (resource) level custom field using CSOM in Project Online.Thanks, Parth

View Article


After Changing the start date for a task in a project we are not able to save

Hi  When we are updating the task start date of a particular task the below message is poping up in Project Professional and when we trying to update in Pwa and saving it automatically the save is...

View Article

i dont know what to call it yet plz read this (pitch document)

Introyour a robber or somthing you break into a two story house not knowing that a FBI lives there goes up stairs and sees a uav control pad on a desk not knowing that you walk over to it thinking its...

View Article

Sharepoint Designer 2013 custom code activity with project CSOM

Hi, i have a code activity  Inside a SharePoint designer 2013 action. It takes 4 parameters and :- Project Url http://server/pwa- project name - Custom field GUID- Value of custom fieldIt works fine...